South Essex Sewerage District – Combined Heat & Power Facility

Location:
50 Fort Ave Salem, MA
General Contractor:
Methuen Construction
Owner:
South Essex Sewerage District

Project

This project consisted of the electrical construction of a combined heat and power unit in an existing wastewater treatment plant. The scope of work included underground duct bank and ground grid installation, furnish and installation of 15kV feeders, 15kV switchgear, 480V transformer, Neutral Grounding Resistor, two Variable Frequency Drives, and lighting protection.